Expansion of Krasnodar CHPP with Installation of CCP-410, LLC "LUKOIL-Kubanenergo", Russian Federation

Krasnodar CHPP (KCHPP) LLC "LUKOIL-Kubanenergo"


The project covers capacity expansion at Krasnodar CHPP (KCHPP) of LLC "LUKOIL-Kubanenergo" through installation of a CCP-410 combined-cycle plant with 416.5MW of installed electrical capacity and 220 Gcal/h of thermal capacity from steam extraction turbines. The plant is based on M701F4 gas-turbine units manufactured by Mitsubishi Heavy Industry Ltd. (MHI).
Power supply to end users from CCP-410 will be in the order of 3 210 k MWh per year, heat supply - 715 k Gcal per year. The implemented technologies help to enhance heat and power generation efficiency and comply with all up-to-date environmental standards.
The greenhouse gas emission reductions under the project are due to increased efficiency and higher power output at Krasnodar CHPP that are achieved through application of the state-of-the-art technology of CCP-based power generation with the corresponding substitution of grid power generated within the Integrated Energy System "South".

Expected emission reductions over 2011-2012 – 1 507 kt ян2e

Project status

Validated
29.08.2011
BVC
Approved
12.03.2012
Order of the Russian Ministry
of Economic Development No.112
dated March 12, 2012

Project Design Document

Determination Report